Location: Dalkey
Client: Twinlite
Size: 1.3 Ha
Embracing modern advancements in off-site construction, the design is composed entirely of components that can be manufactured and assembled off-site, creating a more reliable, sustainable, cost-efficient construction process.
By occupying less than 30% of the site area, the design minimizes the scheme's impact on the existing woodland.
The building form and footprint adopts a sensitive approach, respecting its woodland surroundings. Occupying the footprint of an existing surface car park, the building weaves through an existing large grove of woodland trees, with green roofs and fluid balcony forms reflecting the rolling natural landscape.